Your area:Your area:Choose your area:
Sun–Thu 8am – 8pm · Fri 8am – 4pm · Sat ClosedSun–Thu 8am – 8pm · Fri 8am – 4pm · Sat Closed CSLB #1059213 — verify on the CSLB site (opens in new tab) (669) 600-6422

San Mateo County · Bay Area

Remodeling and additions in Redwood City, San Carlos & Belmont

From flat-lot bungalows to hillside homes in Emerald Hills and Belmont, we remodel kitchens and baths, add primary suites and second stories, and build ADUs on lots of every shape.

Most of our reviews come from Los Angeles clients; we're earning more in the Bay Area now.

Illustration of a typical home in Redwood City and San CarlosIllustration

Local know-how

Remodeling in Redwood City, San Carlos & Belmont

White and gray kitchen with tall pantry cabinets, a stainless French-door refrigerator and an island opening to the living room
A Tulip project in the Bay Area

Homes we see

1940s–60s homes, hillside homes.

Permits and approvals

Each city's building department: City of Redwood City, City of San Carlos and City of Belmont, each with its own grading permits and hillside or sloping-lot rules. Emerald Hills is unincorporated and handled by San Mateo County Planning and Building.

Sources: City of Redwood City — Building Inspection & Code Enforcement (opens in new tab) · City of San Carlos — Building Division (opens in new tab) · City of Belmont — Permit center (opens in new tab) · San Mateo County — Building (unincorporated areas) (opens in new tab) · San Mateo County — Emerald Lake Hills Design Review Officer (opens in new tab)

Neighborhoods

Emerald HillsFarm HillMount CarmelRedwood ShoresSan CarlosBelmont

ZIPs served

940619406294063940659407094002

Building on a slope

Hillside lots in Emerald Hills, Farm Hill and the hills above San Carlos and Belmont come with views and privacy, and with a slope that drives the design. Each city has its own rules, and Emerald Hills is unincorporated, so it is reviewed by San Mateo County rather than a city.

What the reviews look at. In Redwood City, larger projects on sloping lots, and changes of any size on the steepest lots, need an Architectural Permit; the findings ask that a design respect the site's natural constraints, avoid excessive grading, and minimize large exterior walls, upper-story massing and exposed underfloors. San Carlos applies a Hillside Overlay to steeper lots, with height measured from the lowest finished grade, step-backs on downhill walls, cut and fill balanced on site, part of the lot left natural, and stepped foundations as the standard approach. Belmont reviews new homes and larger upper-floor additions through single-family design review, and doesn't allow grading during the winter rain period without an exception.

Grading and soils. All three cities require a grading permit once excavation or fill goes beyond a small amount (around 50 cubic yards, or a cut or fill more than a few feet deep), and hillside projects usually need a soils or geotechnical report before permits are issued. The exact triggers depend on the city and the project. That report sets the foundation design, so it comes first.

Foundations, access and cost. Hillside houses are usually built on stepped foundations, drilled piers with grade beams, or retaining walls rather than a simple slab. Access is often the hidden cost: narrow streets, steep driveways and little room to stage materials can mean smaller equipment, pumped concrete and more labor hours. Those items make a hillside project cost more than the same square footage on a flat lot, so we price them line by line after the soils report instead of carrying a vague allowance.

Our part: we arrange the survey and soils investigation, prepare drawings, coordinate structural and geotechnical engineering, prepare the planning and grading submittals, respond to comments, and schedule the work and inspections around the grading season where it applies.

Last reviewed: October 2026 · Sources: Redwood City Zoning Code — Article 45, Architectural Permits (opens in new tab) · Redwood City Code — Chapter 9, grading (Appendix J amendments) (opens in new tab) · City of Redwood City — Residential building permit checklist (opens in new tab) · San Carlos Municipal Code — Chapter 18.12 Hillside Overlay District (opens in new tab) · San Carlos Municipal Code — Chapter 12.08 Grading (opens in new tab) · Belmont City Code — Chapter 9 Grading (opens in new tab) · City of Belmont — Grading permit guidelines (opens in new tab) · City of Belmont — Hillside development (opens in new tab) · San Mateo County — Emerald Lake Hills Design Review Officer (opens in new tab)

Illustration: hillside home with a stepped additionIllustration

Work near you

Recent work from across the Bay Area and Los Angeles

Projects are labeled with where they were built: in the Bay Area or by our Los Angeles team.

How it works

Five steps. One team.

  1. 1
    Illustration: a consultation at the kitchen table

    Free consultation

    We visit your home, walk the space and listen to how you live. We talk honestly about scope, budget and timing — and whether we're the right fit.

    What you getNotes, next steps and a written price-and-timeline summary

  2. 2
    Illustration: reviewing a 3D design

    Design & 3D renderings

    Our designers turn ideas into a plan you can see in 3D. We walk showrooms with you and pass along our trade pricing on selections.

    What you getRenderings and selections list

  3. 3
    Illustration: a written price and timeline summary

    Price & contract

    Once the design is set, we confirm the final price and timeline in a contract, with payments tied to completed work.

    What you getFinal price and contract

  4. 4
    Illustration: a crew at work with a supervisor on site

    Permits & construction

    We handle engineering, permits and inspections. A Tulip supervisor runs the site every working day, and you get regular updates.

    What you getPermit set, schedule, weekly updates

  5. 5
    Illustration: a final walkthrough in a finished room

    Final walkthrough

    A thorough inspection and punch list before we call it done — and we stand behind the work after we leave.

    What you getPunch list and warranty documents

Our full process

FAQ

Remodeling in Redwood City, San Carlos & Belmont: questions

Who issues permits for a home in Emerald Hills?

Emerald Hills is unincorporated, so San Mateo County Planning and Building handles permits, and the county's Emerald Lake Hills design review applies to new development.

Do I need a grading permit for a hillside addition?

Usually. Redwood City, San Carlos and Belmont each require a grading permit once excavation or fill passes a small threshold, around 50 cubic yards in each city, though the depth and area triggers differ.

Will I need a soils report?

On a hillside lot, almost always. Redwood City's permit checklist calls for one on hillside projects, and the report determines the foundation design.

Can grading happen year-round in Belmont?

No. Belmont doesn't allow grading during the winter rain period (November 15 to April 15) without an exception, so we plan excavation for the dry months.

Does a second story in Redwood City need planning approval?

Most upper-story additions need an Architectural Permit, usually decided by the Zoning Administrator; larger projects on sloping lots go to a public hearing.

Why does building on a slope cost more?

Deeper or stepped foundations, retaining walls, engineering and harder site access all add cost. We price each after the soils report rather than guessing.

Book a consultation

Planning a project in Redwood City, San Carlos or Belmont?

We reply within one business day.

Still from a Tulip Remodeling client video, filmed in a finished kitchen with rift-oak cabinets and a marble backsplash
From one of our client videos: a finished Tulip kitchen in Los Angeles

What are you planning?

Step 1 of a short questionnaire · about two minutes · then pick a consultation time

Prefer to talk? Call (669) 600-6422

Which office?

Los Angeles · (310) 954-0051 Bay Area · (669) 600-6422

Booking confirmed

You're booked.

Your confirmation and an add-to-calendar link are on their way by email. We'll be in touch within one business day if anything needs confirming.

Before we talk, have these handy:

Need to change the time? Call (310) 954-0051(669) 600-6422

Cookie preferences