Kitchen remodeling, designed and built by one team
From a smarter layout to cabinetry, stone and lighting, we design and build kitchens that work as well as they look — with one team responsible for every trade and a supervisor on site every working day.
Most of our reviews come from Los Angeles clients; we're earning more in the Bay Area now.

- Licensed, bonded & insured · CSLB #1059213 (opens in new tab)
- 20+ years of team experience
- Permits handled
- Supervisor on site daily
- 3D design included
Kitchen remodeling at a glance
- Typical budget
- $60K–$120K
- Design, permits and ordering
- 6–12 weeks (10–20 if walls or the layout change)
- Construction
- 6–10 weeks (10–16 if walls or the layout change)
- Permits
- Usually required when plumbing, electrical, gas or walls change
- Best for
- Layouts that don't work, dated or failing cabinets, opening to a family room
Plan your kitchen
What would yours cost?
Typical range: $60K–$120K. Set your size and finish level for a planning range in about a minute.
Before & after
Real Tulip projects
Drag each slider to compare.


L-shaped kitchen, green to crisp white · Kitchen · Bay Area


Cherry & granite to soft blue-gray · Kitchen · Bay Area


U-shaped kitchen with light-oak cabinetry · Kitchen · Echo Park, Los Angeles
Gallery
Kitchen remodeling by Tulip
Finished projects and Tulip 3D designs (labeled). Tap to enlarge.
How it comes together
How a kitchen comes together
Illustration Illustration of a typical kitchen remodel
- 1

Existing kitchen, measured and documented
- 2

Demolition and protection of the rest of the house
- 3

Rough plumbing, electrical and framing, then inspection
- 4

Drywall and cabinet installation
- 5

Templating and stone installation
- 6

Backsplash, lighting, appliances, final walkthrough
What's included
Everything under one contract
- Layout planning and 3D renderings
- Cabinetry (custom and semi-custom)
- Counters and backsplash
- Plumbing, gas and electrical
- Lighting plan
- Flooring
- Appliances (supply or install)
- Structural work for wall removal
- Permits, inspections and final sign-off
Budget
What shapes cost
Typical range: $60K–$120K Full remodel of a typical kitchen: new cabinets, quartz counters, appliances, flooring, lighting and limited layout changes. Includes design, permit preparation and construction; city permit fees are separate.
How pricing and payment work
After the consultation you get a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). The final price is set in your contract. The deposit is $1,000 or 10% of the contract price, whichever is less; the rest is paid at written milestones as work is completed and materials are delivered, with the final balance at completion.
IllustrationPermits and local rules
Who issues permits, and what we prepare
LADBS for City of LA addresses; other cities (Glendale, Burbank, Pasadena, Santa Monica, Beverly Hills) have their own departments.
Each city's building department; some require design review only when exteriors change.
What Tulip prepares
- Drawings, engineering and Title 24 energy calculations
- The permit submittal and plan-check corrections
- Scheduling and meeting every inspection through final sign-off
FAQ
Kitchen remodeling questions
How long does a kitchen remodel take?
Typically 3–5 months from the first design meeting to completion: about 6–12 weeks for design, permits and ordering, then 6–10 weeks of construction. Moving walls or plumbing stretches that to 5–8 months. You get both phases on a written schedule after the consultation.
Can we stay in the house?
Usually, yes. We seal the work zone off from the rest of the house, and we can set up a temporary kitchen area if you want one.
Can you remove the wall to the family room?
Often. An engineer checks whether it is load-bearing and specifies the beam; we include that in the permit set.
Do I have to buy cabinets through you?
No, but buying through us keeps one team accountable for fit and schedule.
Do you help pick finishes?
Yes. We go to showrooms with you and pass along our trade pricing.
What warranty comes with the work?
Tulip's warranty is typically one year on workmanship from completion, plus manufacturers' warranties. Your exact terms are in your contract.
Book a consultation
Let's plan your project
- Tell us about your projectAnswer a few quick questions about your home, the project, your budget and your timing. It takes about two minutes, and we reply within one business day.
- Free in-home consultationA Tulip project leader visits, walks the space with you and talks through your goals, budget and what your city will require. The visit takes about 45–60 minutes (up to 90 for larger projects), with no pressure and no obligation.
- A price, then design and contractAfter the visit we send a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). We then develop the design with 3D renderings and set the final price in your contract, with payments tied to completed work. Nothing is ordered or built until you approve it in writing.
We reply within one business day.

Prefer to talk? Call LA(310) 954-0051Bay Area(669) 600-6422



