Whole-home remodeling under one contract

A whole-home remodel touches every trade at once. We plan the layout, phase the work, pull the permits and run the site, so you deal with one project leader and one schedule from start to finish.

Most of our reviews come from Los Angeles clients; we're earning more in the Bay Area now.

Open-plan interior with wide-plank oak floors running from the entry to the kitchen and a living room with a corner fireplace

Whole-home remodeling at a glance

Typical budget
$300K–$650K
Design, permits and ordering
3–5 months (4–8 for a full gut renovation)
Construction
4–8 months (6–12 for a full gut renovation)
Permits
Always
Best for
Homes bought to renovate, outdated layouts, multiple rooms at once

Plan your whole-home

What would yours cost?

Typical range: $300K–$650K. Set your size and finish level for a planning range in about a minute.

Living through it

Live-in or move out?

Stay in the homeMove out
ScheduleLonger; work is phased room by roomShorter; crews work everywhere at once
CostExtra protection and phasingRent or short-term housing
Best whenWork is limited to part of the houseKitchen, baths and systems all change

What's included

What's usually inside a whole-home project

  • Layout changes and wall removal
  • Kitchen and baths
  • Flooring throughout
  • Electrical panel and wiring updates
  • Plumbing (often repiping)
  • HVAC
  • Windows and doors
  • Insulation and energy upgrades (Title 24)
  • Paint and trim

How it comes together

Illustration Illustration of a typical whole-home remodel

  1. 1
    Illustration, typical whole-home remodel, stage 1: the closed floor plan

    Walkthrough of the existing plan

  2. 2
    Illustration, stage 2: demolition with a wall marked for removal

    Demolition and wall removal

  3. 3
    Illustration, stage 3: new beam and systems rough-in

    New beam and systems rough-in

  4. 4
    Illustration, stage 4: drywall and new flooring

    Drywall and flooring

  5. 5
    Illustration, stage 5: finishes going in

    Finishes by area

  6. 6
    Illustration, stage 6: the finished open plan

    Punch list

See a real Tulip whole-home project

Budget

What shapes cost

Typical range: $300K–$650K About 1,500–2,000 sq ft: kitchen, two bathrooms, flooring, paint and selected electrical and plumbing upgrades. Extensive gut renovations can exceed this. Includes design, permit preparation and construction; city permit fees are separate.

How pricing and payment work

After the consultation you get a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). The final price is set in your contract. The deposit is $1,000 or 10% of the contract price, whichever is less; the rest is paid at written milestones as work is completed and materials are delivered, with the final balance at completion.

Estimate your cost

Permits and local rules

Who issues permits, and what we prepare

A whole-home remodel always needs permits. LADBS covers City of Los Angeles addresses; independent cities such as Glendale, Burbank, Pasadena, Santa Monica and Beverly Hills review their own, and historic overlay zones add review for exterior changes.

What Tulip prepares

  • Drawings, engineering and Title 24 energy calculations
  • The permit submittal and plan-check corrections
  • Scheduling and meeting every inspection through final sign-off

How permitting works

Diagram of the permit process from drawings to final inspectionIllustration
Open full size (opens in new tab)

FAQ

Whole-home remodeling questions

Where do we start — design or price?

Both together: the consultation sets a budget range, and design is developed to that budget.

What if you find problems behind the walls?

We document and price them before work continues; nothing proceeds without your written approval.

Can you work with our architect?

Yes.

How do you keep us updated?

A written update with photos every week, more often during key phases, and a running schedule.

What warranty comes with the work?

Tulip's warranty is typically one year on workmanship from completion, plus manufacturers' warranties. Your exact terms are in your contract.

Book a consultation

Let's plan your project

  1. Tell us about your projectAnswer a few quick questions about your home, the project, your budget and your timing. It takes about two minutes, and we reply within one business day.
  2. Free in-home consultationA Tulip project leader visits, walks the space with you and talks through your goals, budget and what your city will require. The visit takes about 45–60 minutes (up to 90 for larger projects), with no pressure and no obligation.
  3. A price, then design and contractAfter the visit we send a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). We then develop the design with 3D renderings and set the final price in your contract, with payments tied to completed work. Nothing is ordered or built until you approve it in writing.

We reply within one business day.

Still from a Tulip Remodeling client video, filmed in a finished kitchen with rift-oak cabinets and a marble backsplash
From one of our client videos: a finished Tulip kitchen in Los Angeles

What are you planning?

Step 1 of a short questionnaire · about two minutes · then pick a consultation time

Which office?

Los Angeles · (310) 954-0051 Bay Area · (669) 600-6422

Booking confirmed

You're booked.

Your confirmation and an add-to-calendar link are on their way by email. We'll be in touch within one business day if anything needs confirming.

Before we talk, have these handy:

Need to change the time? Call (310) 954-0051(669) 600-6422

Cookie preferences