Your area:Your area:Choose your area:
Sun–Thu 8am – 8pm · Fri 8am – 4pm · Sat ClosedSun–Thu 8am – 8pm · Fri 8am – 4pm · Sat Closed CSLB #1059213 — verify on the CSLB site (opens in new tab) LA(310) 954-0051Bay Area(669) 600-6422

Build up, keep your yard

A second story can double your living space on the lot you already have. It's also the most involved addition there is, so it starts with the questions that matter most: can the structure carry it, what will the city review, and how will your family live through it.

Estimate the cost of a second story

Most of our reviews come from Los Angeles clients; we're earning more in the Bay Area now.

Single-story home with a matching second-story additionDesign concept

Second-story additions at a glance

Typical budget
$450K–$850K
Design, engineering and review
5–10 months
Construction
6–10 months
Permits
Always; design review in many cities
Best for
Single-story homes on lots too tight to build out

Plan your second-story

What would yours cost?

Typical range: $450K–$850K. Set your size and finish level for a planning range in about a minute.

Design

Design that looks original to the house

Design concept, before: single-story 1950s ranch home
Design concept: ranch home with a second story added
Design concept
Design concept, before: single-story Spanish Revival home
Design concept: Spanish Revival home with a second story added
Design concept
Design concept, before: single-story Craftsman bungalow
Design concept: Craftsman home with a second story added
Design concept

Second-story additions that look original to the house

Before design

Four questions we answer first

  1. 1

    Can your foundation and framing carry a second floor?

    Structural evaluation

  2. 2

    What does your city allow?

    Height, daylight plane, floor-area limits, setbacks

  3. 3

    Will it need design review?

    E.g. Palo Alto's two-story objective standards or optional Individual Review; some Eichler neighborhoods have single-story overlays that bar second stories

  4. 4

    Will you live at home during the work?

    Usually not while the roof is off; we plan those weeks with you

How it comes together

How a second story comes together

Illustration Illustration of a typical second-story addition

  1. 1
    Illustration, stage 1: the original ranch

    Existing single-story house

  2. 2
    Illustration, stage 2: foundation reinforcement

    Foundation reinforcement

  3. 3
    Illustration, stage 3: roof removed and floor framed

    Roof removed and floor framed

  4. 4
    Illustration, stage 4: second floor framed and dried in

    Walls and roof framed, house dried in

  5. 5
    Illustration, stage 5: new stair and rough-in

    Stair, rough-in and inspections

  6. 6
    Illustration, stage 6: the finished two-story home

    Finished exterior that matches the original style

See a representative second-story project, start to finish

Local rules

Regional notes

Los Angeles

Hillside, HPOZ and coastal-zone reviews where they apply.

Bay Area

City review (Palo Alto's two-story standards or Individual Review; design review in Los Altos, Saratoga and San Mateo; a use permit for many Menlo Park second stories on substandard lots), seismic upgrades, Title 24.

Budget

What shapes cost

Typical range: $450K–$850K About 800–1,200 sq ft, including stairs, roof replacement and typical structural strengthening below. Extensive first-floor remodeling costs extra. Includes design, permit preparation and construction; city permit fees are separate.

How pricing and payment work

After the consultation you get a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). The final price is set in your contract. The deposit is $1,000 or 10% of the contract price, whichever is less; the rest is paid at written milestones as work is completed and materials are delivered, with the final balance at completion.

Estimate your cost

FAQ

Second-story additions questions

Do we have to move out?

For a full second story, usually yes for part of the job, because the roof comes off; partial second stories and rear extensions can sometimes be built while you stay. We agree on a schedule up front that shows which weeks you'll want to be elsewhere.

How long does design review take?

It depends on the city and the design. We prepare the drawings and support you through the review, and we give you a realistic range for your city before design starts.

Will a second story raise my property taxes?

Usually the new construction is assessed; confirm with your county assessor (Los Angeles County Assessor (opens in new tab), Santa Clara County Assessor (opens in new tab)).

Can you match our existing exterior?

That's the goal on every second story: roof pitch, siding, trim and windows are designed to read as part of the original house.

Is a second story or a ground-floor addition better for us?

It depends on your lot, your foundation and how you want to live. Our comparison guide walks through the trade-offs.

What warranty comes with the work?

Tulip's warranty is typically one year on workmanship from completion, plus manufacturers' warranties. Your exact terms are in your contract.

Book a consultation

Let's plan your project

  1. Tell us about your projectAnswer a few quick questions about your home, the project, your budget and your timing. It takes about two minutes, and we reply within one business day.
  2. Free in-home consultationA Tulip project leader visits, walks the space with you and talks through your goals, budget and what your city will require. The visit takes about 45–60 minutes (up to 90 for larger projects), with no pressure and no obligation.
  3. A price, then design and contractAfter the visit we send a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). We then develop the design with 3D renderings and set the final price in your contract, with payments tied to completed work. Nothing is ordered or built until you approve it in writing.

We reply within one business day.

Still from a Tulip Remodeling client video, filmed in a finished kitchen with rift-oak cabinets and a marble backsplash
From one of our client videos: a finished Tulip kitchen in Los Angeles

What are you planning?

Step 1 of a short questionnaire · about two minutes · then pick a consultation time

Which office?

Los Angeles · (310) 954-0051 Bay Area · (669) 600-6422

Booking confirmed

You're booked.

Your confirmation and an add-to-calendar link are on their way by email. We'll be in touch within one business day if anything needs confirming.

Before we talk, have these handy:

Need to change the time? Call (310) 954-0051(669) 600-6422

Cookie preferences