Your area:Your area:Choose your area:
Sun–Thu 8am – 8pm · Fri 8am – 4pm · Sat ClosedSun–Thu 8am – 8pm · Fri 8am – 4pm · Sat Closed CSLB #1059213 — verify on the CSLB site (opens in new tab) (310) 954-0051

Los Angeles County · Los Angeles

Remodeling and additions in Culver City

Culver City's 1930s–50s bungalows and ranch homes sit on lots that suit ADUs and rear additions.

Illustration of a typical home in Culver CityIllustration

Local know-how

Remodeling in Culver City

View into a finished ADU bathroom with a gray-tile walk-in shower, frameless glass door and white vanity
A Tulip project in Mar Vista, Los Angeles

Homes we see

1930s–50s bungalows and ranch houses.

Permits and approvals

City of Culver City Building Safety for Culver City addresses, with a Zoning Clearance alongside the building permit; Ladera Heights is unincorporated LA County, so permits there come from LA County Public Works.

Sources: Culver City Building Safety (opens in new tab) · Culver City Municipal Code Ch. 17.510 — Zoning clearances (opens in new tab) · LA County Public Works — Building and Safety (opens in new tab)

Neighborhoods

Carlson ParkCulver WestBlair HillsFox HillsLadera Heights

ZIPs served

902309023290056

Adding on in Culver City

Culver City's single-family (R1) zone caps a home at a 0.45 floor area ratio, with height limits of 27 feet for flat roofs and 30 feet for sloped roofs. A second story must sit 25 feet back from the front lot line, against 20 feet for the first floor, and stay under a setback plane that starts 18 feet above the side lot lines.

No separate design hearing. A single-family addition gets a ministerial Zoning Clearance with the building permit rather than site plan review. New homes and major remodels (more than 50% demolition, or an addition of more than 50% that adds at least 1,500 square feet) must meet the city's Objective Design Standards. Exterior changes to a designated Landmark or Significant structure need a Certificate of Appropriateness. ADUs and junior ADUs are approved ministerially and don't have to meet the Objective Design Standards.

Timing and site waste. The city says plan checks currently take about 15 to 20 business days. Under its local green building rules, an addition or alteration valued at more than half the house's replacement value must recycle or salvage at least 75% of construction waste, with third-party verification.

Our part: we run the floor-area and setback numbers for your lot before design, prepare the drawings and Zoning Clearance, arrange the waste-diversion paperwork when it applies, and take the project through plan check and inspections.

Last reviewed: October 2026 · Sources: Culver City Municipal Code Ch. 17.210 — Residential zoning districts (opens in new tab) · Culver City Municipal Code Ch. 17.510 — Zoning clearances (opens in new tab) · Culver City — Residential and mixed use Objective Design Standards (opens in new tab) · Culver City Municipal Code Ch. 15.05 — Historic preservation (opens in new tab) · Culver City Municipal Code Ch. 15.02 — Local green building amendments (opens in new tab) · Culver City Building Safety (opens in new tab)

Illustration: post-war bungalow kitchen opened to the living roomIllustration

How it works

Five steps. One team.

  1. 1
    Illustration: a consultation at the kitchen table

    Free consultation

    We visit your home, walk the space and listen to how you live. We talk honestly about scope, budget and timing — and whether we're the right fit.

    What you getNotes, next steps and a written price-and-timeline summary

  2. 2
    Illustration: reviewing a 3D design

    Design & 3D renderings

    Our designers turn ideas into a plan you can see in 3D. We walk showrooms with you and pass along our trade pricing on selections.

    What you getRenderings and selections list

  3. 3
    Illustration: a written price and timeline summary

    Price & contract

    Once the design is set, we confirm the final price and timeline in a contract, with payments tied to completed work.

    What you getFinal price and contract

  4. 4
    Illustration: a crew at work with a supervisor on site

    Permits & construction

    We handle engineering, permits and inspections. A Tulip supervisor runs the site every working day, and you get regular updates.

    What you getPermit set, schedule, weekly updates

  5. 5
    Illustration: a final walkthrough in a finished room

    Final walkthrough

    A thorough inspection and punch list before we call it done — and we stand behind the work after we leave.

    What you getPunch list and warranty documents

Our full process

FAQ

Remodeling in Culver City: questions

How long does an ADU take?

Typically 7–13 months from the first design meeting for a detached or attached ADU, 6–10 months for a garage conversion and 4–7 months for a junior ADU. Plan-check time depends on the building department, so we confirm current timing for your address when we apply and put both phases on a written schedule.

Does a second story in Culver City need design review?

Not a separate hearing. A single-family addition gets a ministerial Zoning Clearance with the building permit, checked against the R1 standards, including a 25-foot front setback for the second story and a side setback plane that starts 18 feet up. Larger projects, with more than 50% demolition or a 50%-plus addition of at least 1,500 square feet, must also meet the Objective Design Standards.

What kinds of projects do you take on in Culver City?

Kitchens, bathrooms, whole-home remodels, additions, second stories, ADUs and garage conversions, with exterior work as part of larger projects. Most projects fall in the $30K–$325K range; second stories and whole-home remodels usually cost more, as the project cards above show. We don't take on repairs or paint- or flooring-only jobs.

Book a consultation

Planning a project in Culver City?

We reply within one business day.

Still from a Tulip Remodeling client video, filmed in a finished kitchen with rift-oak cabinets and a marble backsplash
From one of our client videos: a finished Tulip kitchen in Los Angeles

What are you planning?

Step 1 of a short questionnaire · about two minutes · then pick a consultation time

Prefer to talk? Call (310) 954-0051

Which office?

Los Angeles · (310) 954-0051 Bay Area · (669) 600-6422

Booking confirmed

You're booked.

Your confirmation and an add-to-calendar link are on their way by email. We'll be in touch within one business day if anything needs confirming.

Before we talk, have these handy:

Need to change the time? Call (310) 954-0051(669) 600-6422

Cookie preferences