Your area:Your area:Choose your area:
Sun–Thu 8am – 8pm · Fri 8am – 4pm · Sat ClosedSun–Thu 8am – 8pm · Fri 8am – 4pm · Sat Closed CSLB #1059213 — verify on the CSLB site (opens in new tab) LA(310) 954-0051Bay Area(669) 600-6422

Powder room · Beverly Hills

A dark, dated powder room becomes a marble-and-plaster jewel box

A veined marble floating vanity, a brushed-brass wall faucet and warm plaster walls.

Powder room with a veined marble floating vanity, brass wall faucet, wall-hung toilet and gray plaster walls

The brief

Turn a dark, dated powder room into a small room guests remember, with a floating stone vanity, wall-mounted fixtures that free up floor space, and warm plaster walls.

Project at a glance

Location
Beverly Hills
Completed
2023
Scope
Powder room
Typical size for a similar project
About 20–40 sq ft
Typical timeline for a similar project
Design, permits and ordering 6–12 weeks; construction 3–5 weeks; 2–4 months in total

Estimate a project like this

Before and after

The powder room before the remodel, with a dark wood vanity, black fixtures and textured walls
Powder room remodel with a veined marble floating vanity, brushed-brass wall-mounted faucet and warm gray plaster-finish walls
Before: A dark wood vanity, black fixtures and textured walls. After: A veined marble floating vanity, a brushed-brass wall-mounted faucet and warm gray plaster-finish walls.

Veined marble, brushed brass, plaster finish, wall-hung toilet

Book a consultation

Planning something similar?

  1. Tell us about your projectAnswer a few quick questions about your home, the project, your budget and your timing. It takes about two minutes, and we reply within one business day.
  2. Free in-home consultationA Tulip project leader visits, walks the space with you and talks through your goals, budget and what your city will require. The visit takes about 45–60 minutes (up to 90 for larger projects), with no pressure and no obligation.
  3. A price, then design and contractAfter the visit we send a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). We then develop the design with 3D renderings and set the final price in your contract, with payments tied to completed work. Nothing is ordered or built until you approve it in writing.

We reply within one business day.

Still from a Tulip Remodeling client video, filmed in a finished kitchen with rift-oak cabinets and a marble backsplash
From one of our client videos: a finished Tulip kitchen in Los Angeles

What are you planning?

Step 1 of a short questionnaire · about two minutes · then pick a consultation time

Prefer to talk? Call (310) 954-0051

Which office?

Los Angeles · (310) 954-0051 Bay Area · (669) 600-6422

Booking confirmed

You're booked.

Your confirmation and an add-to-calendar link are on their way by email. We'll be in touch within one business day if anything needs confirming.

Before we talk, have these handy:

Need to change the time? Call (310) 954-0051(669) 600-6422

Cookie preferences