The brief
Turn a dark, dated powder room into a small room guests remember, with a floating stone vanity, wall-mounted fixtures that free up floor space, and warm plaster walls.
Project at a glance
- Location
- Beverly Hills
- Completed
- 2023
- Scope
- Powder room
- Typical size for a similar project
- About 20–40 sq ft
- Typical timeline for a similar project
- Design, permits and ordering 6–12 weeks; construction 3–5 weeks; 2–4 months in total
Before and after


Veined marble, brushed brass, plaster finish, wall-hung toilet
Book a consultation
Planning something similar?
- Tell us about your projectAnswer a few quick questions about your home, the project, your budget and your timing. It takes about two minutes, and we reply within one business day.
- Free in-home consultationA Tulip project leader visits, walks the space with you and talks through your goals, budget and what your city will require. The visit takes about 45–60 minutes (up to 90 for larger projects), with no pressure and no obligation.
- A price, then design and contractAfter the visit we send a written summary with an approximate price and timeline, usually within 2–3 business days (4–7 for larger projects). We then develop the design with 3D renderings and set the final price in your contract, with payments tied to completed work. Nothing is ordered or built until you approve it in writing.
We reply within one business day.

Prefer to talk? Call (310) 954-0051

